To book an appointment call Shawn Morrison @ 705-692-3327
Misha and Tyler B.

Misha and Tyler B.

Regular price $12,000.00 Sale

Upper Deck: Remove existing railings and cedar under deck and install new black aluminum railings with pickets and new cedar T&G on the ceiling. Materials and labour included.

Lower Deck: Remove existing deck, stairs and supporting upper deck post. Rebuild a new 10'x11' pressure treated deck with a 5 foot wide set of stairs using helical piles to meet 2026 building codes. This lower deck will also have black aluminum railings installed with pickets. Materials and labour included.

Total Project Cost: $16,000.00

75% deposit required $12,000.00

25% balance upon completion $4,000.00