Estimated starting date would be end of June beginning of July.
1) Materials and labour included
2) Built to 2023 building code.
3) Floating deck design (not attached to house) poured floating 2'x2'x3" cement pads.
4) Grade existing ground soil under deck for water to run off away from house.
5) Staircase(s) (not included.)
6) One 8' wide step infront of back door included.
7) Removing existing deck (not included.)
$15,250.00 plus H.S.T
Removal of existing cement piers will be an additional cost of $1,200.00 plus H.S.T (includes machinery, labour and dump fees for existing concrete piers.)
Project Total $16,450.00 plus H.S.T
Payment schedule:
Total Deposit
75% is $12,337.50 plus H.S.T ÷ 2 = $6,168.75 (first deposit payment)
Final Payment
25% is $4,112.50 plus H.S.T Once project is completed.