Estimated starting date would be end of June beginning of July.
1) Materials and labour included
2) Built to 2023 building code.
3) Floating deck design (not attached to house) poured floating 2'x2'x3" cement pads.
4) Grade existing ground soil under deck for water to run off away from house.
5) Staircase(s) (not included.)
6) One 8' wide step infront of back door included.
7) Removing existing deck (not included.)
$15,250.00 plus H.S.T
Removal of existing cement piers is an additional cost of $1,200.00 plus H.S.T (includes machinery, labour and dump fees for existing concrete piers.)
Total $16,450.00 plus H.S.T
Payment schedule:
Deposit required is 75% which equals $12,337.50 plus H.S.T ÷ 2 = $6,168.75 (second deposit payment)
Final payment of 25% which is $4,112.50 plus H.S.T will be payed out once the total cedar deck project is completed.