{"product_id":"mish-and-tyler","title":"Misha and Tyler B.","description":"\u003cp\u003eUpper Deck: Remove existing railings and cedar under deck and install new black aluminum railings with pickets and new cedar T\u0026amp;G on the ceiling. Materials and labour included.\u003c\/p\u003e\n\u003cp\u003eLower Deck: Remove existing deck, stairs and supporting upper deck post. Rebuild a new 10'x11' pressure treated deck with a 5 foot wide set of stairs using helical piles to meet 2026 building codes. This lower deck will also have black aluminum railings installed with pickets. Materials and labour included.\u003c\/p\u003e\n\u003cp\u003eTotal Project Cost: $16,000.00\u003c\/p\u003e\n\u003cp\u003e75% deposit required $12,000.00\u003c\/p\u003e\n\u003cp\u003e25% balance upon completion $4,000.00\u003c\/p\u003e","brand":"Morrison Cedar Products","offers":[{"title":"Default Title","offer_id":43776306315330,"sku":null,"price":12000.0,"currency_code":"CAD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1750\/5721\/files\/rn-image_picker_lib_temp_897e3fc4-2ab4-4a24-8348-22bd5120e6c2.jpg?v=1758130883","url":"https:\/\/sudburycedarproducts.com\/products\/mish-and-tyler","provider":"Morrison Cedar Products","version":"1.0","type":"link"}